{"id":2553,"date":"2026-06-30T12:48:28","date_gmt":"2026-06-30T12:48:28","guid":{"rendered":"https:\/\/www.rjtmontech.com\/installation-of-a-stretch-film-production-line-in-saudi-arabia-complete-relocation-of-an-italian-colines-production-line\/"},"modified":"2026-06-30T13:24:30","modified_gmt":"2026-06-30T13:24:30","slug":"installation-of-a-stretch-film-production-line-in-saudi-arabia-complete-relocation-of-an-italian-colines-production-line","status":"publish","type":"post","link":"https:\/\/www.rjtmontech.com\/en\/installation-of-a-stretch-film-production-line-in-saudi-arabia-complete-relocation-of-an-italian-colines-production-line\/","title":{"rendered":"Installation of a Stretch Film Production Line in Saudi Arabia \u2013 Complete Relocation of an Italian Colines Production Line"},"content":{"rendered":"\n<p>Installation of a stretch film production line in Saudi Arabia was one of our international projects. Production line relocation and installation is a process that requires precise planning, extensive experience, and excellent coordination of activities often carried out across different countries. Each stage\u2014from equipment dismantling and international transportation to reassembly and preparation for commissioning\u2014must be performed in accordance with the manufacturer\u2019s documentation and the highest safety standards.  <\/p>\n\n<p>One of our recent projects involved the installation of a stretch film production line in Saudi Arabia. The project included the assembly of an Italian-made Colines production line with a 3,000 mm working width, designed for the manufacturing of high-quality stretch film. <\/p>\n\n<p>This was the second phase of a larger international project. The first stage was completed at the end of last year in Germany, where our team was responsible for dismantling the production line and preparing all equipment for safe relocation. Following its transportation to Saudi Arabia, we carried out the complete reassembly and installation of the production line, restoring the entire system at its new location.<br\/> <br\/> <br\/>  <\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited.jpeg\" alt=\"\" class=\"wp-image-2545\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited.jpeg 1600w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited-300x169.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited-1024x576.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited-768x432.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited-1536x864.jpeg 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Production Line Relocation \u2013 From Germany to Saudi Arabia<\/h2>\n\n<p>An international production line relocation involves far more than simply transporting equipment. Every component of the installation must be carefully labeled, securely protected, and properly prepared for reassembly at the new location. <\/p>\n\n<p>The work carried out in Germany included the complete dismantling of the production line, documentation of individual systems, and preparation of all equipment for international transportation. Thanks to the proper labeling of every component, the installation process at the customer&#8217;s new facility in Saudi Arabia was carried out efficiently and without unnecessary delays. <\/p>\n\n<p>This approach minimizes production downtime and significantly streamlines the subsequent installation of the equipment.<\/p>\n\n<h2 class=\"wp-block-heading\">Scope of Installation of a Stretch Film Production Line<\/h2>\n\n<p>After all components were delivered to the final destination, we commenced the complete installation of the production line.<\/p>\n\n<p>The scope of work included:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>reassembly of all equipment after transportation,<\/li>\n\n\n\n<li>installation of support structures,<\/li>\n\n\n\n<li>installation of mechanical components,<\/li>\n\n\n\n<li>positioning of the main technological units,<\/li>\n\n\n\n<li>installation of auxiliary systems,<\/li>\n\n\n\n<li>integration of individual line modules,<\/li>\n\n\n\n<li>verification of compliance with the manufacturer&#8217;s documentation.<\/li>\n<\/ul>\n\n<p>Each stage was carried out by an experienced team of specialists with many years of expertise in the installation and relocation of industrial machinery.<\/p>\n<style>.kb-row-layout-id2532_861855-28 > .kt-row-column-wrap{align-content:start;}:where(.kb-row-layout-id2532_861855-28 > .kt-row-column-wrap) > .wp-block-kadence-column{justify-content:start;}.kb-row-layout-id2532_861855-28 > .kt-row-column-wrap{column-gap:var(--global-kb-gap-md, 2rem);row-gap:var(--global-kb-gap-md, 2rem);padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;grid-template-columns:repeat(2, minmax(0, 1fr));}.kb-row-layout-id2532_861855-28 > .kt-row-layout-overlay{opacity:0.30;}@media all and (max-width: 1024px){.kb-row-layout-id2532_861855-28 > .kt-row-column-wrap{grid-template-columns:repeat(2, minmax(0, 1fr));}}@media all and (max-width: 767px){.kb-row-layout-id2532_861855-28 > .kt-row-column-wrap{grid-template-columns:minmax(0, 1fr);}}<\/style><div class=\"kb-row-layout-wrap kb-row-layout-id2532_861855-28 alignnone wp-block-kadence-rowlayout\"><div class=\"kt-row-column-wrap kt-has-2-columns kt-row-layout-equal kt-tab-layout-inherit kt-mobile-layout-row kt-row-valign-top\">\n<style>.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col,.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col:before{border-top-left-radius:0px;border-top-right-radius:0px;border-bottom-right-radius:0px;border-bottom-left-radius:0px;}.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col{column-gap:var(--global-kb-gap-sm, 1rem);}.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col{flex-direction:column;}.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col > .aligncenter{width:100%;}.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col:before{opacity:0.3;}.kadence-column2532_bc2eeb-f6{position:relative;}@media all and (max-width: 1024px){.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col{flex-direction:column;justify-content:center;}}@media all and (max-width: 767px){.kadence-column2532_bc2eeb-f6 > .kt-inside-inner-col{flex-direction:column;justify-content:center;}}<\/style>\n<div class=\"wp-block-kadence-column kadence-column2532_bc2eeb-f6 inner-column-1\"><div class=\"kt-inside-inner-col\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-1024x768.jpeg\" alt=\"\" class=\"wp-image-2533\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-1024x768.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-300x225.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-768x576.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-1536x1152.jpeg 1536w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div><\/div>\n\n\n<style>.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col,.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col:before{border-top-left-radius:0px;border-top-right-radius:0px;border-bottom-right-radius:0px;border-bottom-left-radius:0px;}.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col{column-gap:var(--global-kb-gap-sm, 1rem);}.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col{flex-direction:column;}.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col > .aligncenter{width:100%;}.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col:before{opacity:0.3;}.kadence-column2532_a38dbc-d3{position:relative;}@media all and (max-width: 1024px){.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col{flex-direction:column;justify-content:center;}}@media all and (max-width: 767px){.kadence-column2532_a38dbc-d3 > .kt-inside-inner-col{flex-direction:column;justify-content:center;}}<\/style>\n<div class=\"wp-block-kadence-column kadence-column2532_a38dbc-d3 inner-column-2\"><div class=\"kt-inside-inner-col\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation-1024x768.jpeg\" alt=\"\" class=\"wp-image-2535\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation-1024x768.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation-300x225.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation-768x576.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation-1536x1152.jpeg 1536w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-disassembly-and-installation.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div><\/div>\n\n<\/div><\/div>\n<h2 class=\"wp-block-heading\">Precise Line Positioning \u2013 The Key Stage of the Project<\/h2>\n\n<p><em><br\/>One of the most demanding stages of the project was the positioning of all main components of the production line.<br\/><br\/><\/em><\/p>\n\n<p><em>Modern stretch film production lines operate with very high precision. Even minor deviations during installation can affect the quality of the final product, the stability of the production process, and the subsequent operation of the equipment. <\/em><\/p>\n\n<p><em>Therefore, during the project, special attention was given to:<\/em><\/p>\n\n<ul class=\"wp-block-list\">\n<li><em>precise leveling of the structure,<\/em><\/li>\n\n\n\n<li><em>maintaining installation tolerances in accordance with Colines documentation,<\/em><\/li>\n\n\n\n<li><em>alignment of mechanical components,<\/em><\/li>\n\n\n\n<li><em>inspection of connections between individual modules,<\/em><\/li>\n\n\n\n<li><em>verification of the correct installation of all components.<\/em><\/li>\n<\/ul>\n\n<p><em>Precision at this stage has a direct impact on the subsequent performance and reliability of the entire installation.<\/em><\/p>\n\n<h2 class=\"wp-block-heading\">Project Challenges<\/h2>\n\n<p><em>The installation in Saudi Arabia took place during a period of heightened geopolitical risk in the region. This required excellent work organization and flexible schedule management. <\/em><\/p>\n\n<p><em>The main challenges included:<\/em><\/p>\n\n<ul class=\"wp-block-list\">\n<li><em>coordination of work previously carried out in Germany and continued in Saudi Arabia,<\/em><\/li>\n\n\n\n<li><em>organization of international transport of large line components,<\/em><\/li>\n\n\n\n<li><em>carrying out the installation in accordance with local regulations and the investor\u2019s requirements,<\/em><\/li>\n\n\n\n<li><em>ongoing cooperation with local technical teams,<\/em><\/li>\n\n\n\n<li><em>maintaining project timelines despite demanding organizational conditions.<\/em><\/li>\n<\/ul>\n\n<p><em>Thanks to proper preparation and the experience of our team, all works were carried out in accordance with the agreed schedule.<\/em><\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited.jpeg\" alt=\"\" class=\"wp-image-2547\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited.jpeg 1600w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited-300x169.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited-1024x576.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited-768x432.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-relocation-edited-1536x864.jpeg 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Why Does Team Experience Matter?<\/h2>\n\n<p><em>Installing production lines involves far more than simply assembling individual components. Each installation requires knowledge of the manufacturer\u2019s technical documentation, proper assembly procedures, and experience gained from executing similar projects. <\/em><\/p>\n\n<p><em>During the project in Saudi Arabia, special attention was paid to the quality of execution at every stage of the works. Regular checks of installation compliance with the technical documentation helped avoid errors that could have affected the subsequent commissioning stages of the production line. <\/em><\/p>\n\n<h2 class=\"wp-block-heading\">Project Outcome <\/h2>\n\n<p>The installation project of the Italian Colines line in Saudi Arabia confirmed our experience in managing international industrial investments.<\/p>\n\n<p>The combination of the earlier relocation phase in Germany and the final installation at the new site required excellent organization, precision, and close cooperation among all project participants.<\/p>\n\n<p><br\/>This is another project demonstrating that we are a partner capable of executing complex projects involving dismantling, relocation, and installation of advanced production lines worldwide.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"900\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited.jpeg\" alt=\"\" class=\"wp-image-2549\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited.jpeg 1600w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited-300x169.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited-1024x576.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited-768x432.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-i-demontaz-maszyny-edited-1536x864.jpeg 1536w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Are you looking for a partner for production line relocation or installation?<\/h2>\n\n<p>We deliver comprehensive projects including:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>relocation of machinery and production lines,<\/li>\n\n\n\n<li>dismantling and reassembly of equipment,<\/li>\n\n\n\n<li>installation of industrial machinery,<\/li>\n\n\n\n<li>installation of new production lines,<\/li>\n\n\n\n<li>technical support during commissioning,<\/li>\n\n\n\n<li>supervision of projects carried out domestically and abroad.<br\/><br\/><\/li>\n<\/ul>\n\n<p id=\"do-kontaktu\">If you are planning a plant relocation, installation of a new production line, or require an experienced partner for an industrial project, please contact us. We will be happy to prepare a solution tailored to the specifics of your investment. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"2541\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines-1024x768.jpeg\" alt=\"\" class=\"wp-image-2541\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines-1024x768.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines-300x225.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines-768x576.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines-1536x1152.jpeg 1536w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-colines.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"2543\" src=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines-1024x768.jpeg\" alt=\"\" class=\"wp-image-2543\" srcset=\"https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines-1024x768.jpeg 1024w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines-300x225.jpeg 300w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines-768x576.jpeg 768w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines-1536x1152.jpeg 1536w, https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/montaz-maszyny-przemyslowej-colines.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Installation of a stretch film production line in Saudi Arabia was one of our international projects. Production line&#8230;<\/p>\n","protected":false},"author":2,"featured_media":2546,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1,35],"tags":[],"class_list":["post-2553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bez-kategorii","category-industrial-installations"],"taxonomy_info":{"category":[{"value":1,"label":"Bez kategorii"},{"value":35,"label":"Industrial Installations"}]},"featured_image_src_large":["https:\/\/www.rjtmontech.com\/wp-content\/uploads\/2026\/06\/Colines-machine-dismantling-and-installation-edited-1024x576.jpeg",1024,576,true],"author_info":{"display_name":"rjtmontech","author_link":"https:\/\/www.rjtmontech.com\/en\/author\/rjtmontech\/"},"comment_info":1,"category_info":[{"term_id":1,"name":"Bez kategorii","slug":"bez-kategorii","term_group":0,"term_taxonomy_id":1,"taxonomy":"category","description":"","parent":0,"count":13,"filter":"raw","cat_ID":1,"category_count":13,"category_description":"","cat_name":"Bez kategorii","category_nicename":"bez-kategorii","category_parent":0},{"term_id":35,"name":"Industrial Installations","slug":"industrial-installations","term_group":0,"term_taxonomy_id":35,"taxonomy":"category","description":"","parent":0,"count":4,"filter":"raw","cat_ID":35,"category_count":4,"category_description":"","cat_name":"Industrial Installations","category_nicename":"industrial-installations","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/posts\/2553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/comments?post=2553"}],"version-history":[{"count":6,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/posts\/2553\/revisions"}],"predecessor-version":[{"id":2561,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/posts\/2553\/revisions\/2561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/media\/2546"}],"wp:attachment":[{"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/media?parent=2553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/categories?post=2553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rjtmontech.com\/en\/wp-json\/wp\/v2\/tags?post=2553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}